News & Events

UFOC Obtained National highway No.5 system upgrade project 2015.07.01

 

1.  The Engineering Project  term

From Jun. 25.2015 to Dec.10.2017,totally 900 calendar days.

 2.  The Engineering Project range

The Engineering location is as following :

(1)Taiwan Area National Freeway Bureau North district engineering Agency administered National

highway No.5 whole route.

(2)Interchange of above route section.

(3)All related contact highway and local highway(which including 106(106 County Road B)191(County Road 191 A)、台2(Taiwan Provincial Highway 2 Geng)、台9(Taiwan Provincial Highway 9)Haishan west Road Masai Road etc.)

(4)All facilities of this Project should be integrated to National highway Pinglin Traffic Control Center under controlled , it will be interfaced and integrated with National highway No.5 Transit controlElectromechanical system upgrade & improvement Project  Central information Engineering R14A Tender(Below description will be called Central information Engineering Tender or  R14A Tender),it will be test with every item of related integrated testing .

(5)Pinglin Traffic Control Center(Which is including Building decoration and  Electromechanical system coordinate Engineering ).

3.  Engineering construction range is as following map.


蔣渭水高速公路-維基百科

National highway No.5


106 County Road B

County Road 191 A
 

Taiwan Provincial Highway NO. 2 Geng and Taiwan Provincial Highway NO. 9

Haishan west Road and Masai Road

 

Address:No. 12, Creation 4th Road, Science-Based Industrial Park, Hsinchu City, Taiwan R.O.C. TEL:886-3-5779211 FAX:886-3-5779333 
Copyright © 2013 UFOC. All rights reserved  Web Design:TSG